Buildiyo offers four house construction packages: Smart at ₹1,800 per sq.ft, Classic at ₹2,350, Premium at ₹2,448 and Luxury at ₹2,970, all inclusive of GST. Each is priced against a defined specification running to roughly 150 line items. The rate is fixed against that specification — but the package cost is not the project budget, and the gap between them is where most planning goes wrong.
Package-based construction exists to solve a real problem: comparing builders is nearly impossible when every quotation describes a different scope. A package fixes the specification first and prices against it, which makes comparison meaningful. See the full listing on the house construction packages page, or call +91 70921 66366, +91 70921 66266 or +91 70921 66177.
The rates quoted in this article were taken from the Buildiyo packages page and are correct as at the date of publication. Construction pricing moves with material and labour markets, and the packages page is the authoritative source. Final pricing for your project depends on built-up area, design requirements, site conditions, material selections, approvals, specification changes, location and scope, and is confirmed only after a site measurement and a written quotation. Treat every figure here as indicative.
What House Construction packages are
A construction package bundles a defined specification — materials, brands, allowances, finishes and design deliverables — into a single rate per square foot of built-up area. Instead of negotiating each item, you choose a specification tier and the cost follows from your area. Buildiyo’s packages are documented across ten specification sections covering architecture, structure, kitchen, bathroom, flooring, doors and windows, electrical, painting, miscellaneous items and the fee structure, with roughly 150 individual line items in each.
That level of documentation is the actual value. A per-square-foot rate on its own means very little — two builders quoting the same number can be planning very different houses. A rate attached to a line-item specification is a commitment you can hold someone to, and it is what makes a package different from a quotation.
The Four Packages compared
All four share the same structural approach and quality framework; what changes between them is material grade and finishing allowance.
Swipe or scroll to see the full table →
| Package | Per sq.ft | Suits | Key inclusions | Worth noting |
|---|---|---|---|---|
| Smart | ₹1,800 | First-time builders working to a defined budget | M20 RCC, 43-grade cement, Fe500 steel, concrete block walls, 10 ft floor height, vitrified tiles or granite | Anti-termite, rainwater harvesting and 3D elevation available at extra cost |
| Classic | ₹2,350 | Most standard family homes | M20 RCC, 53-grade cement, Fe550D steel, chamber brick walls, basic 3D elevation, anti-termite included | Rainwater harvesting still additional; sump specification differs |
| Premium | ₹2,448 | Homeowners prioritising material grade | M25 RCC, premium 53-grade cement, Fe550D, wirecut brick, double-charged vitrified tiles, rainwater harvesting included | Higher finishing allowances throughout; 3D walkthrough preview |
| Luxury | ₹2,970 | Larger homes and higher specification | M25/M30 RCC, 11 ft floor height, large-format tiles or Italian marble, premium UPVC windows, teak main door | Editable design files, unlimited iterations, wider colour allowance |
Waterproofing to terrace and all wet areas, the bar bending schedule, chicken mesh at junctions, plinth protection and the door and window schedule are specified identically in every package. The differences sit in concrete grade, cement and steel grade, wall material, and the allowances for tiles, sanitaryware, doors and windows.
Set the two lists side by side. Identical in every tier: waterproofing, the bar bending schedule, chicken mesh at junctions, plinth protection, the door and window schedule. Varying by tier: concrete and steel grade, wall material, and the allowances for tiles, sanitaryware, doors and windows. The constants are the items whose absence causes a building to fail — water ingress, cracking at junctions, reinforcement that was never scheduled properly. The variables are grade and allowance. So the tiers are not selling four levels of soundness; they are selling four levels of finish against a fixed floor. That is precisely what licenses the article’s most counterintuitive advice — that a Smart package built properly beats a Luxury specification on an overstretched house, and that reducing area buys more than dropping a tier. Dropping a tier trades finish; reducing area changes the total linearly. Neither touches the floor, which is the one thing you could not correct later anyway.
Two Builders Quoting the Same Rate Can Be Planning Very Different Houses
A rate attached to a line-item specification is something you can hold someone to. That attachment is what separates a package from a quotation.
Illustrative construction package cost
Worked examples only, calculated by multiplying the listed rate by built-up area. Your actual quotation will differ.
Swipe or scroll to see the full table →
| Package | Per sq.ft | 1,000 sq ft | 1,500 sq ft | 2,000 sq ft |
|---|---|---|---|---|
| Smart | ₹1,800 | ₹18.00 lakh | ₹27.00 lakh | ₹36.00 lakh |
| Classic | ₹2,350 | ₹23.50 lakh | ₹35.25 lakh | ₹47.00 lakh |
| Premium | ₹2,448 | ₹24.48 lakh | ₹36.72 lakh | ₹48.96 lakh |
| Luxury | ₹2,970 | ₹29.70 lakh | ₹44.55 lakh | ₹59.40 lakh |
Each figure above is simply the rate multiplied by the area. A real quotation reflects your actual drawings, the number of bathrooms and kitchens against the package allowances, foundation depth, soil conditions, site access and every specification choice you make. It is issued after a site measurement. Use these numbers to narrow your shortlist, not to set your budget.
Package Cost Is Not project budget
This is the single most useful distinction in the whole article, and the one homeowners most often miss. The package covers construction to a defined specification. A completed, occupiable house costs more, and the difference is not hidden — it is simply outside the package by design.
Budget separately for:
- Land, and any statutory charges or registration associated with it.
- Design fees, which the packages page states as a percentage of construction cost, payable at project commencement.
- Statutory approvals — explicitly excluded and billed at actuals.
- Soil testing and any specialised foundation the soil report calls for.
- Compound wall and gates — charged additionally in every package.
- Temporary electricity and water during construction, which the page places in the owner’s scope.
- The main panel board and electricity board connection, also owner’s scope.
- Interiors beyond the package — modular kitchen units, wardrobes, false ceilings and loose furniture.
- Elevation cladding, grooves, projections or pergolas, which sit outside the standard elevation scope.
- Changes requested after approval, which are repriced by written variation.
None of these are surprises if you read the specification. They become surprises when a homeowner takes the package rate as the project cost — which is why the exclusions list deserves as much attention as the inclusions.
If the numbers do not work, reducing area usually buys more than dropping a tier.
— Cheapest is not a strategy, and neither is dearest
The Inclusions Sell the Package. The Exclusions Determine Your Real Budget.
Approvals, compound wall, utility connections, interiors and design fees all sit outside by design. Read that list before the one in the brochure.
How to Compare construction packages
- Fix the area basis firstEstablish exactly how built-up area is measured. Two builders measuring differently produce non-comparable rates for the same house.
- Read the exclusions before the inclusionsThe inclusions sell the package; the exclusions determine your real budget.
- Check the allowances, not just the brandsBathroom and kitchen counts, tile rates per square foot, sanitaryware budgets and window area allowances all cap what the package actually covers.
- Confirm material grades in writingConcrete grade, cement grade, steel grade and brand ranges — these are the items that cannot be inspected once built.
- Understand the payment scheduleWhen each instalment falls due, what triggers it, and where the money is held.
- Ask how change orders are pricedEvery project has changes. What matters is whether they are quoted and approved in writing before execution.
- Check quality processes and the timelineHow work is inspected and recorded, and what the programme looks like including the pre-construction period.
- Get it in writing before anything startsThe packages page is explicit that the specification document is not a contract until the project begins. Make sure the contract carries the specification you agreed.
The lowest tier is not automatically the wrong choice, and the highest is not automatically the right one. A Smart package built properly on a sensible layout will serve a family better than a Luxury specification on a house stretched beyond its budget — and the reverse is equally true where finishing quality genuinely matters to the household. What decides it is the total project budget against your actual built-up area, not the headline rate. If the numbers do not work, reducing area usually buys more than dropping a tier.
What the packages include on the design side
Every package includes a documented design deliverable set, and it scales with the tier. All four include structural design, a door and window schedule, a bar bending schedule, and plumbing and electrical layout drawings provided before execution begins. What varies is the number of floor plan iterations, elevation coverage and 3D output.
If you want to understand those deliverables in more depth, we cover them separately: house floor plan design, elevation design, structural design and drawings and 3D rendering. The architect design service in Chennai page explains how the design stage works alongside construction.
Frequently Asked Questions and how to close on a tier
How much does a house construction package cost in Chennai?
Buildiyo’s packages are currently listed at ₹1,800 per sq.ft for Smart, ₹2,350 for Classic, ₹2,448 for Premium and ₹2,970 for Luxury, all inclusive of GST. On a 1,500 sq ft built-up area that works out at roughly ₹27 lakh to ₹44.55 lakh for the construction package itself. These are indicative; the final quotation follows a site measurement and depends on your actual specification.
What area is the rate applied to?
The package built-up area, which is what the specification refers to throughout — bathroom, kitchen, railing and electrical allowances are all expressed per unit of package built-up area. Confirm exactly how your area is measured before comparing any two quotations, because different builders measure differently and the same house can produce different figures.
Is the rate per sq.ft fixed?
The packages page states that the rate is fixed against the specification you choose and does not change unless you request a change in scope, with soil conditions and statutory approvals billed separately at actuals. Quoted pricing is held for 60 days under the stated Price Guard; after that a new quotation is issued at prevailing rates.
What is not included in a construction package?
Several things are explicitly outside the package: statutory approvals, the compound wall and gates, temporary electricity and water during construction, the main panel board and the electricity board connection, and elevation cladding or projections. Rainwater harvesting is additional on Smart and Classic but included on Premium and Luxury, and anti-termite treatment is additional on Smart only.
Which construction package is suitable for my budget?
Work backwards from total project budget rather than forwards from the rate. Take your built-up area, multiply by the package rate, then add design fees, approvals, the compound wall, utility connections and a contingency. If the total exceeds your budget, reducing built-up area usually gives more room than dropping a package tier — and a smaller well-specified house generally serves better than a larger under-specified one.
When do payments fall due, and how are they made?
The packages page states that all payments go to a dedicated escrow account allocated to the owner, and that no cash payments are accepted. Confirm the specific milestone schedule for your project in writing before signing, since that is what governs when each instalment becomes payable.
What happens between booking and construction starting?
The page describes a post-booking period of approximately 45 to 60 days covering site reconnaissance, soil testing, structural drawings, approval, contract drafting and a site meeting, with construction commencing once those are complete. Budget for that gap when planning your timeline.
Start from the total, not the rate
Four points to close onA package rate is a useful comparison tool and a poor budgeting tool.
It tells you what construction to a defined specification costs; it does not tell you what your house will cost.
Build the total first: area multiplied by rate, plus every excluded item, plus a contingency — then choose the tier that fits.
Read the exclusions, confirm how area is measured, and get the specification into the contract.
Free Site Visit and Measured Estimate
We measure the plot, check soil and access, and issue a quotation against the package you choose — with the full specification attached, so you can see exactly what is in and what is out. Sree Narayana Complex, Velachery, Chennai 600042.
Start from the total, not the rate
A package rate is a useful comparison tool and a poor budgeting tool. It tells you what construction to a defined specification costs; it does not tell you what your house will cost, because approvals, design fees, the compound wall, utility connections and interiors sit outside it by design.
So build the total first. Area multiplied by rate, plus every excluded item, plus a contingency — and then choose the tier that fits. Read the exclusions, confirm how area is measured, and get the specification into the contract. See how we build at our house construction company in Chennai page.