Procurement · Including a test of our own product
Fifteen technical requirements to test before buying construction quality inspection software, with the test to run for each, a nought-to-three scoring rubric, and eight mandatory items that disqualify a product outright

Every demo looks good on office wifi. Score the tests, not the slides.

The hard part of evaluating quality inspection software is not finding features. Every vendor has a long list and most of the lists look alike. The hard part is working out which claims hold up in a basement with no signal, on a Sunday pour, in the hands of a site engineer who did not attend the training.

0
Requirements, each with a test you can run yourself
0
Mandatory items — failing one ends the evaluation
0
Points where our own two official pages disagree
0
Maximum score, and why the total is the wrong thing to rank on
In this guide — 6 sections
  1. Why feature lists fail, ours included
  2. The fifteen requirements
  3. Scoring, and the rule that matters
  4. Running a trial that means something
  5. Our own product, same fifteen
  6. Questions and the bottom line
Direct answer

Every construction quality inspection software demo looks good, because demos run on office wifi with clean data and a presenter who knows where not to click. The fifteen requirements below are the ones that decide whether the tool survives a real site, and each comes with a test you can run yourself. Eight are mandatory: failing any one of them should end the evaluation regardless of what else the product does well. Score the tests, not the slides.

01 / 6
Intent, not capability

Why Feature Lists Cannot Be Trusted — including ours

We tested this on our own product, and it proved the point

Before writing this guide we compared the two official descriptions of BuildiyoQC — our own product page and our Google Play listing. They do not match on six of the fifteen items below. The product page states automatic NCR raising, IS-code validation of measurements, read-only client access, element-linked material consumption, three languages and a web portal. The Play Store listing mentions none of those six. Nobody is lying. A product page and an app-store listing get written at different times, by different people, for different audiences, and both go stale. That is exactly why a feature list is evidence of intent rather than of capability — and why the only question worth asking a vendor is show me. If our own two pages disagree, assume everyone else’s do too.

Definition — Quality inspection software

Software that records site inspections against defined checklists, captures photographic evidence, routes results through an approval chain and retains the result as a durable record. It is distinct from general project management software: the output is not a schedule or a task list but an evidential record of what was inspected, by whom, against which requirement, and what was decided. What such a tool changes for a project manager day to day, and why adoption is harder to compare than features, is covered in our guide to construction apps for project managers.

02 / 6
Eight integrity, seven capability

The Fifteen Requirements, and how to test each one

Mandatory items are marked M. The first eight are integrity requirements — they decide whether the record you end up with can be relied on at all. The last seven are capability requirements, genuinely valuable, but a tool that nails all seven and fails any of the first eight is still the wrong tool.

Swipe or scroll to see the full table →

RequirementWhat goes wrong without itThe test to runM / O
1. Offline inspection captureInspections written on paper and typed up from memory that eveningAeroplane mode on. Complete a full checklist and attach photographsM
2. Ordered sync on reconnectRecords arrive jumbled or overwrite each other after a long offline spellCreate three records offline, reconnect, confirm all three arrive in sequenceM
3. Stamped photographsA photograph that cannot be tied to a place or a time proves nothing laterTake one offline. Check the stamp appears on the device, not at uploadM
4. Audit trail that cannot be editedEvidence can be quietly changed, so the record is worthless in a disputeAsk to change a submitted entry. Then ask to see the change historyM
5. Stage-lock controlsThe next stage starts before this one passed, and defects get coveredTry to open the next stage while the current one is unapprovedM
6. Multi-level approvalOne signature stands in for three independent checksSubmit as site engineer. Confirm it cannot self-approveM
7. Reject with a reasonRejections go unrecorded, so the same defect comes back twiceReject something. Try to submit the rejection with the reason blankM
8. Server-side role enforcementPermissions applied on the handset can be worked aroundLog in as a viewer and attempt an approval. Then try it offlineM
9. Automatic NCR on failureFailed checks rely on someone remembering to raise the reportFail a checklist item. See whether a report opens by itselfO
10. Code validation of measurementsTolerance checks are done mentally and inconsistentlyEnter an out-of-tolerance measurement. Ask which code it checked againstO
11. Element-level inspection dataRecords attach to documents, not to the column that was pouredOpen one element and ask to see every inspection ever done on itO
12. Read-only client accessClients get PDF summaries instead of the live recordAsk for a client login. Try to edit something with itO
13. Photo-backed daily progressDaily reports become text written from memory after site hoursAsk to see yesterday’s report with its photographs attachedO
14. Element-linked materialsConsumption cannot be traced to where it wentAsk which element a given material booking was consumed againstO
15. Local language and web accessThe people doing the inspecting cannot read the checklistSwitch the app language. Open the web portal as a managerO

Several of these have a guide of their own, which is where to look if you want to know what you are testing for rather than only how to test it: offline capture and the aeroplane-mode test for items 1 to 3, stage-wise control and hold points for item 5, the three-level approval chain for items 6 to 8, defect tracking for item 9, and IS code inspection checklists for item 10. Item 11 is what connects inspections to a model, so that decisions attach to a building element rather than to a folder.

03 / 6
Nought to three

Scoring, and the rule that makes the total mean anything

Score each requirement on what you actually saw

Copy the requirement list into a sheet with a score column and an observation column, one column per product
  • 0 — absent, or the vendor could not show it.
  • 1 — claimed on a slide or a feature list, but not demonstrated.
  • 2 — demonstrated, with caveats or workarounds.
  • 3 — demonstrated cleanly, on a real device, under the test conditions above.
  • Maximum 45 across fifteen requirements — but see the rule below before ranking on it.
  • Write the observation down while you are still looking at the screen, not afterwards from memory.
Do not simply pick the highest total

A score of 0 or 1 on any mandatory item disqualifies the product outright, whatever it scores elsewhere — otherwise a tool with many attractive extras can outscore one that simply works on site. Rank only the products that clear all eight mandatory items, and use the total to separate those. A vendor who will not let you run test 1 and test 8 on a real device has already answered the question.

Applied honestly this scorecard disqualifies the company publishing it, and that is correct

Run the rule above against the disclosure at the top of this page. A score of 1 means claimed on a feature list but not demonstrated. Three of the eight mandatory items — the audit trail, the stage lock and server-side role enforcement — rest on our product page alone, which is a feature list. So on our own rubric, before you have seen anything, we score 1 on three mandatory items, and the rule says that ends the evaluation. The temptation is to soften the rule. Do not; it is the only part of this page with any force. The resolution is to read the score correctly. A 1 is not an accusation that a feature is missing. It is an accurate statement that you have not seen it work. Every vendor starts at 1 on everything, so the scorecard is not measuring their product at all. It is measuring your diligence. That matters because of a perversity in the design. If you score the documentation, you reward marketing hygiene rather than capability: a vendor whose two pages happen to agree looks solid, and one who audited its own pages and published the discrepancy looks worse. So score only what you watched happen on a device in your own hand, and treat a disclosure like ours as a test-ordering signal — a free list of where to push hardest first.

Two hours, five tests

Start Where the Vendor’s Own Pages Disagree

Tests 1 and 8 eliminate more products than the other thirteen combined. Add the items where that vendor’s sources conflict and you have the short version.

What offline really means →
04 / 6
Who drives the trial

Running a Trial whose results mean something

  • Put the tests in a site engineer’s hands — not a head-office evaluator’s. The people who will use the tool daily find the friction a manager clicking through a demo never will, and their verdict on whether a checklist is quick enough to complete in front of a waiting trade is worth more than any feature comparison.
  • Use one real element on a live project — not sample data. Sample data hides exactly the mess the software has to cope with: missing drawings, half-finished records, an element nobody named properly.
  • Run the same sequence on every product on the shortlist, in the same order, so the comparison is between products rather than between moods.
  • Write the observation down at the screen — the most common evaluation failure is not choosing the wrong tool, it is finishing three trials with a clear memory of the demo and a vague recollection of what each product actually did.
  • Keep the filled scorecards afterwards — when the tool disappoints in month four, the record of what was demonstrated is what you negotiate from.
05 / 6
Our own product, scored honestly

What BuildiyoQC States, and what you should still test

Here is our own product against the same fifteen, taken from what is published rather than what we would like to claim. Where our two sources disagree we have said which one carries the claim, because that is the column that tells you where to push.

Swipe or scroll to see the full table →

RequirementWhat is statedWhich source states it
1–2. Offline and ordered syncInspections captured offline; entries sync in order on reconnect, conflict-safeBoth sources
3. Stamped photographsGPS, time and user watermarked, fully offlineBoth sources
4. Audit trailNothing is edited or erased without a traceProduct page only
5. Stage-lockThe next stage stays locked until this one is approvedProduct page only
6–7. Approval and reject with reasonThree levels — site engineer, QC engineer, consultant — each with reject-with-reasonBoth sources
8. Server-side rolesTwelve roles, enforced server-sideProduct page only
9. Automatic NCRA failed quality check opens its own reportProduct page only
10. Code validationMeasurements auto-validated against IS 456, IS 1786, IS 516 and othersProduct page only
11. Element-level dataBuilt on the IFC model; elements are the heart of the modelBoth sources
12. Client read-only accessClients view from anywhere, read-onlyProduct page only
13. Photo-backed daily reportDaily report with watermarked site photographsBoth sources
14. Element-linked materialsConsumption booked against the element it went intoProduct page only
14b. Element-linked labourNot stated — labour is described as trade-wise headcount and attendanceNot claimed
15. Languages and surfacesEnglish, Hindi and Tamil; Android via Google Play with a companion web portalProduct page only
Three things we will not claim

Platforms. BuildiyoQC is stated as an Android app on Google Play, with a companion web portal described on the product page. iOS availability is not stated anywhere, so do not assume it. A mandatory rejection reason. Reject-with-reason is stated at every approval level, but whether the reason field is enforced as mandatory is not stated — so run test 7 and find out. A free trial. No free trial or free tier is published; ask us directly what test access is available rather than assuming. And note where the table above leaves us on our own rubric: three mandatory items carried by one page only, which is a score of 1 until you have seen them yourself.

06 / 6
Questions & the bottom line

Buy on Evidence, not on slides

What should I test first in a construction inspection app comparison?

Offline capture and server-side role enforcement. Put the device in aeroplane mode and complete a full inspection, then try to approve your own submission from an account that should not be able to. Those two tests eliminate more products than the other thirteen combined. After them, test whichever items the vendor’s own sources disagree on.

Why do demos look better than the real thing?

Demos run on office wifi, with prepared data, driven by someone who knows which paths work. None of those conditions exists in a basement at the end of a pour. Insist on testing on your own device, offline, with a member of your site team driving rather than watching.

Which features are genuinely mandatory?

The eight integrity requirements: offline capture, ordered sync, stamped photographs, an audit trail that cannot be edited, stage-lock, multi-level approval, rejection with a reason, and server-side role enforcement. Without these, the record you accumulate may not hold up at the point you need it to.

How do I compare two products objectively?

Run the same fifteen tests on both, score 0 to 3 on what you observed rather than what was claimed, and disqualify any product scoring 0 or 1 on a mandatory item. Compare totals only among the products that clear all eight. Do not score the documentation — consistent web pages are easy to produce and tell you nothing about whether the software works.

What does a score of 1 actually mean?

That you have not seen the feature work, not that it is absent. Every vendor starts at 1 on everything, including us. That is why the scorecard measures your diligence rather than their product — and why a vendor who tells you where its own pages disagree has handed you a test order rather than an excuse.

Is an audit trail that cannot be edited really necessary?

If evidence can be changed after the fact, the record proves only what someone was willing to leave in it. Ask to change a submitted entry during the trial and then ask to see the change history. The answer tells you how much the record is worth in a dispute.

Does BuildiyoQC work on iPhone?

iOS availability is not stated on either the product page or the Google Play listing. BuildiyoQC is stated as an Android app with a companion web portal. Confirm with us before planning around any other platform.

What if a vendor will not let me run these tests?

Treat that as a result. Every test here can be run in a short trial on a real device, and a vendor confident in the product has no reason to refuse. Scoring 1 — claimed but not demonstrated — is the correct entry, and on a mandatory item that ends the evaluation.

Tell us where we score below 3

Run the Fifteen Tests on Us

Bring your own device, your own site and your own scepticism. A filled scorecard showing where we fall short is more useful to us than a signature.

Buildiyo QC on Google Play →

The uncomfortable thing we found writing this guide is that our own two official descriptions of the same product disagree on six of fifteen points. We left it in, because it is the most useful thing on the page: if a vendor’s own pages can drift apart, no feature list anywhere deserves to be taken at face value, ours included. Run the tests, score what you saw rather than what you were told, disqualify on the mandatory eight, and keep the completed scorecards. They are the only comparison that will still make sense in six months.

No cost, no obligation

Evaluating QC Software for Your Projects?

Tell us how many sites you run and how inspections are recorded today, and we will set up a project to test against so you can run the fifteen on a real element rather than on sample data. Across Chennai and Coimbatore.

Contact Buildiyo →

Four rules to carry into any vendor conversation

All four survive contact with a salesperson
1

A claim scores 1 and a demonstration scores 3, so every vendor starts at 1 on everything until you have watched it work.

2

Zero or one on any of the eight mandatory items ends the evaluation, however attractive the rest of the total looks.

3

Do not score the documentation. Use disagreement between a vendor’s own sources to decide what to test first.

4

If fifteen tests is too many, run 1 and 8 plus the contested items — five tests run properly beat fifteen nobody ran.

Continue reading.