In this guide — 6 sections
Set the project up in dependency order: structure and elements first, then budget heads with milestones linked to stages, then people and roles, then materials and labour from day one. The order is not housekeeping. Materials are booked against elements and milestones link to stages that belong to elements, so until the structure exists there is nothing for anything else to attach to, and work done out of order gets redone.
A note on sourcing before anything else: quoted phrases below come from our own published product material, and we say which of them is corroborated on more than one source. Everything unquoted is general project management practice offered as a recommendation, not a published procedure. If you are still deciding between milestone and advance payment as a structure, that is a different question and it is answered in our guide to milestone versus advance payment. This page assumes you have chosen milestones and are setting them up. Buildiyo is on +91 70921 66366, +91 70921 66266 and +91 70921 66177.
Set It Up in dependency order
If you run one to five sites on group chats, a few spreadsheets and a site notebook, nothing in that stack is broken. Each tool does its job. The problem is the gaps between them, and the cost of those gaps is not disorganisation — it is that nothing in a spreadsheet can stop a payment being requested for work that was never approved.
Most builders begin setup by adding people, because adding people feels like starting. It is the wrong end. Everything in a connected project hangs off the structure, so the structure goes in first.
Swipe or scroll to see the full table →
| What you are setting up | What it attaches to | So it cannot exist until |
|---|---|---|
| Buildings and floors | The project | The project exists — this is the start |
| Elements | A floor of a building | Floors are in, and named consistently |
| Stage sequences | An element type | Element types are settled |
| Milestones | A stage that must be approved | Stage sequences exist to point at |
| Material consumption | The element it went into | Elements exist to book against |
| People and roles | A project and its teams | There is a project to assign them to |
One thing to get right on day two rather than discover in month three: an element is the smallest thing you can hold a status against, so coarse elements give coarse answers and you cannot make them finer later without redoing the structure. How fine to go, and why that decision belongs to you and your contractor rather than to your architect, is set out in our guide to preparing the model and choosing tracking granularity.
The Approval That unlocks the payment
In the disconnected setup, the quality check and the payment request are two separate events joined by a phone call. The work gets inspected. Later, somebody asks for money. Whether the second event genuinely depended on the first is a matter of trust and memory, and under schedule pressure trust and memory lose.
A milestone tied to a calendar date pays for elapsed time. A milestone tied to an approved construction stage pays for completed and accepted work. Our published material describes “milestone-based billing you approve — no bulk advances” and states that payment is requested only once the linked stage is approved. The difference is not presentational. In the first case the dependency is procedural and someone has to remember it; in the second it is structural and the system will not let the request exist without the approval.
That is the strongest single argument for putting structure, people, materials and money on one project rather than four tools. It is also the reason the setup order in section one is worth following: a milestone can only point at a stage that already exists.
The commonest setup error is a milestone schedule imported from a payment agreement, where the instalments are described by date or by percentage and nothing names the work that has to be accepted. Go through the schedule line by line and, for each instalment, name the stage whose approval releases it. If you cannot name one, that instalment is paying for time rather than for work, and you have found something worth renegotiating rather than something worth configuring.
Who Approves, and who gets paid
Everything above is right, and it stops one step short. Before the link exists, a stage approval is a technical judgement with nothing riding on it — the approver’s only incentive is to be correct. After it, that same approval releases a payment request. The record has not changed shape, but it is now a financial instrument, and those attract pressures technical records never do. Notice which way the pressure runs, because it is not symmetric. Nobody is ever pressured to withhold an approval: delay costs the contractor money and the builder goodwill, while approving costs nothing today. So the link does not make approvals more accurate. It makes them more likely, and the failure now moves money rather than only a status. The two features a setup guide lists separately are really one control. Milestone-to-stage linking supplies the dependency; role separation supplies the independence that makes it mean something. Have the first without the second and you have installed a lever, handed to the person with the clearest reason to pull it. The test fits in the schedule you are already building: against each instalment, write the approving role and the receiving role side by side. Where they name the same person, the link is decoration. In a three-person firm they will, which is the honest objection — and the control then has to come from outside it, as a consultant approval level. A third level reads as enterprise overhead. It is the small builder who needs it most.
In practice, for a builder running a handful of sites, that usually means you hold the administrative role yourself, your site staff capture the work, your consultant or client provides the approval level that releases money, and the client sees a view with no edit rights. Who may record each level of approval, and what a rejection has to carry with it, is set out in our guide to the inspection approval workflow.
Our material states twelve roles across five teams, each seeing only the screens meant for their team, enforced server-side — but by our own audit that claim appears on the product page only rather than across both published sources, so treat it as something to be shown rather than assumed. Also undocumented: the exact project-creation screens, how budget heads are defined, whether permissions can be customised beyond the listed roles, licence or user limits, and the published description of the project manager role. Confirm these for your project before committing a rollout plan to them. The setup order and the first-week structure on this page are general practice, not a published procedure.
You will notice no feature tallies anywhere on this page. That is on purpose: a setup guide that hangs on how many element types or phases a product lists is out of date the next time either number moves, and none of it helps you configure day two. Test the chain instead. Which of our claims carry one published source behind them and which carry two is set out, claim by claim, in the fifteen tests to run before you buy.
Write the Approver and the Payee Side by Side
Where the two columns name the same person, the milestone link is decoration rather than a control. On a small project the third name usually has to come from outside your own firm.
Materials and Labour: where the chain earns its keep
A material module earns its place at the end of the chain rather than the beginning. Recording a delivery is easy and nearly every tool does it. Recording what the material was consumed by is what turns stock-keeping into cost control, because it is the only way an overrun points at a cause rather than at a total.
Swipe or scroll to see the full table →
| Link in the chain | What most tools record | What makes it cost control |
|---|---|---|
| Requisition | That something was asked for | Who asked, against which budget head |
| Dispatch | That it left the supplier | Which requisition it answers |
| Receipt | Quantity and date received | Shortfall against what was dispatched |
| Usage | Usually nothing at all | Consumption booked against the element it went into |
Our material describes requisition, dispatch, receipt and usage recorded in one chain, with consumption booked against the element it went into, and live cost against the sanctioned budget head by head. The fourth row is the one to test rather than read, because it is the row most products quietly skip.
All of this is captured where the work is, which in practice means on a phone in someone’s pocket rather than in the site office — field staff work from the Android app, available on Google Play, while the oversight and approvals happen in the browser portal.
Daily labour is the other modest record that repays itself later: headcount by trade and by day — mason, bar bender, carpenter, helper, counted separately and marked on site, offline where there is no signal. It takes a minute and it is the record most small builders wish they had kept when a delay has to be explained six months afterwards. What that headcount is actually good for — reading it against reported output rather than admiring it on its own — is covered in our guide to reviewing a site’s day remotely.
The First Week, and the six ways it goes wrong
Swipe or scroll to see the full table →
| Day | Focus | You should end the day with |
|---|---|---|
| Day 1 | Project, buildings, floors | The shell of the project in place |
| Day 2 | Elements and stage sequences | Everything you intend to track, listed |
| Day 3 | Budget heads, milestones linked to stages | No milestone tied to a date alone |
| Day 4 | People, roles and access | Approver and payee never the same person |
| Day 5 | First live inspection, material entry, headcount | One real day of data, end to end |
Day five matters most. A project set up perfectly and never used is worth less than one set up roughly and used from the first day, which is also why a partial first week beats a perfect plan to begin next month.
- Starting with people instead of structureThe most common error of all, and the one that guarantees rework, because people get assigned to teams on a project that has nothing in it yet.
- Elements too coarseOne element called “ground floor walls” cannot show you which wall is held up, and it cannot be subdivided later without redoing the structure.
- Milestones tied to datesA milestone linked to a date pays for time; linked to an approved stage it pays for work. If you configure only one thing carefully, make it this.
- Approver and payee the same personThe quietest of the five, because nothing errors and nothing looks wrong. The milestone link simply stops being a control.
- Running the group chat in parallel “just for now”Two systems means neither is complete, and the informal one always wins. Keep the group for conversation and move records out of it on day one.
- Opening the client view too earlyA client’s first look at a half-populated project does lasting damage to their confidence in the data. Give access once a real week is in.
Start With One Project, not one feature
What does a construction management app for builders do?
It keeps one project’s structure, people, materials, labour and payments on a single connected record, so site activity drives what happens downstream — most importantly, so a payment milestone can depend on an approved construction stage rather than on a separate conversation.
What should I set up first?
The project structure — buildings, floors and elements — because materials are booked against elements and milestones link to stages that belong to elements. People and budgets come after the structure exists. Setting up in the other order means redoing work.
What is milestone billing in construction?
Payment released in instalments tied to defined points of progress rather than in bulk advances. In a connected project each instalment points at a construction stage, and the payment is requested only once that stage has been approved. Whether milestones or advances suit your project in the first place is a separate question with its own guide.
Who should approve the stage that releases a payment?
Not the person who receives the money, and the system should prevent one person holding both positions. On a small project where separation is not available internally, that approval level has to come from outside the firm — a consultant or the client. This is the reason a third approval level matters more to a small builder than to a large one, which is the opposite of how it usually reads on a feature list.
What does a budget head actually give me?
It turns a total into a cause. Live cost against a sanctioned budget, head by head, tells you where an overrun is accumulating rather than only that one exists — but only if material consumption is booked against the element it went into, which is the step most tools skip. How budget heads are defined is not publicly documented, so confirm it for your project.
Can clients see the project?
A read-only view for clients is described in our published material, letting them watch progress and quality status without edit access. As a matter of practice, open it only once there is real data in the project — a first impression of a half-populated status view is hard to undo.
Does it work without a signal on site?
Attendance marked on site by the supervisor offline, and an offline-first inspection workflow, are both described in our material. What offline capability actually means architecturally, and how to test it rather than take it on trust, has its own guide — it is the claim in construction software least settled by a specification sheet.
How long does setup take for a small builder?
The structure on this page is built around five working days for one project, with the heaviest work on elements on day two. That is a planning framework drawn from general practice rather than a published implementation time, and the aim of day five is one real day of data end to end rather than a complete configuration.
Can You Name the Stage Behind Every Instalment?
If an instalment has no stage to point at, it is paying for elapsed time. That is a finding about the agreement rather than about the software.
Set Up One Project With Us, Not Five
Bring one live project and its payment schedule. We will build the structure in dependency order, link the milestones to stages, and get one real day of data through it before you decide anything about the rest. Across Chennai and Coimbatore.
If the link holds on one project, it will hold on the next four
The temptation is to switch everything on and roll it out across every site at once. Take one project instead. Build its structure properly, link its milestones to stages rather than to dates, make sure the person approving each of those stages is not the person being paid for them, and run one real week through it. That single project will tell you more than any amount of configuration across five, and it will tell you the one thing a feature list cannot: whether the approval-to-payment link is a control in your organisation or only a diagram.
Four things to have on paper before day one
Two are structure, two are about who decidesThe element list at the granularity you intend to track, agreed with whoever knows the build sequence.
The stage sequence per element type, checked against how you actually build rather than a default.
Every instalment with the stage that releases it named beside it, and nothing paid on a date alone.
The approver and the payee for each instalment, written side by side and confirmed to be different people.