AIQualityGuard Construction Quality Agent

Every stage, inspected before it's sealed.

Buildiyo's quality agent runs 300+ checks across every build stage, scans site photos for defects, and won't let work proceed until each stage is signed off — so nothing flawed gets buried in your walls.

300+Checks per stage
0Defects carried forward
412Photos logged / stage
98%Avg. stage score
Live agent workspace
Thoraipakkam VillaBrickwork stage412 photos Vera · quality agent active

Stage checklists

300+ checkpoints loaded across 6 active build stages

Total 320 checks
Stage 02✓ QC
RCC & Structurerebar · cover · cube tests

Most checks — load-bearing & safety critical.

52checks
Stage 03✓ QC
Plumbing & Electricalrouting · pressure · load

Concealed work — checked before plaster.

44checks
Stage 01✓ QC
Foundationdepth · PCC · anti-termite

Set-out & soil verified before pour.

38checks
Stage 05✓ QC
Plasteringthickness · level · curing

Surface prep verified before paint.

31checks
Stage 06✓ QC
Waterproofingcoating · slope · ponding

Wet zones tested before tiling.

29checks
Stage 04✓ QC · live
Brickworkplumb · joints · bond

Currently under inspection.

26checks

AI photo scan — brickwork

412 site photos analysed against drawings & IS codes

24 / 26 passed · 3 flags
Wall A✓ Pass
Vertical plumbnorth elevation

Within 3mm tolerance over 3m.

OKverified
Wall C⚠ Flag
Joint thickness2 joints > 12 mm

Exceeds spec — re-pointing advised.

2defects
Conduit✓ Pass
Conduit routingas per drawing

Chases match the electrical layout.

OKverified
Lintel B⚠ Flag
Plaster prep crackhairline at junction

Fill & re-finish before painting.

1defect
Bath 2⚠ Flag
Waterproof cornercoverage gap

Re-coat the corner before tiling.

1defect
Columns✓ Pass
Column alignmentgrid reference

All within positional tolerance.

OKverified

Defects flagged

Agent recommends the rectification & assigns it to a crew

3 defects · 0 carried forward
Mortar joints > 12 mm (×2)Wall C · north elevation
BEST · FIXRe-point jointsminor · no rework1 dayRake & re-fill to spec
Rework coursemajor2 daysRebuild affected course
Accept (cosmetic)needs sign-off0 daysLogged with photo note
Plaster hairline crackLintel B · junction
BEST · FIXFill & re-finishminor1 dayBefore paint stage
Add mesh bandpreventive1.5 daysStops re-cracking
Monitorre-check in 7d0 daysTrack for movement
Waterproofing corner gapBath 2 · floor-wall
BEST · FIXRe-coat cornercritical · wet zone1 day2 coats + fillet
Full re-coatconservative2 daysEntire bath floor
Ponding re-testverify first0.5 dayConfirm leak path

Stage sign-off

Brickwork stage closed only after every defect clears

Stage score 98%
300+ checks completedAcross 6 active build stages
3 defects rectifiedRe-inspected & passedJoints ✓ · Plaster ✓ · Waterproof ✓
Photo-log archived412 geo-tagged images as evidence
Client stage approvalSign-off requested from you

Quality summary

Checks passed24 / 26
Defects found3
Defects resolved3 / 3
Stage score98%
Zero defects carried forwardEvery stage signed off before the next
Why it matters

Caught on camera. Fixed before it's buried.

Defects are cheap to fix today and ruinous to find behind plaster. Vera catches them while they're still visible.

Stage checklists

300+ checkpoints across every stage, from footing to finish.

AI photo scan

Every site photo analysed for defects against drawings & codes.

Defect tracking

Flagged, assigned and re-inspected until it actually passes.

Geo-tagged log

Timestamped photo evidence for every check, on every stage.

Stage sign-off

Nothing proceeds to the next stage until this one is approved.

Built right

300+ checks. Zero defects missed.

Vera inspects every stage of your build, scans the evidence, and won't sign off until it's right — so quality is proven, not promised.

Construction
Interior
AI
Quote
Architecture