fbpx
  • Email: sales@buldiyo.com
  • +91 7092166366
Save Payments Mobile APP Material

Save Up to 15% on Construction and Interior Costs

No Bulk Advance : Pay Weekly Based on Progress

Track Your Home Construction and Interiors Every Step

Transparent BOQ and Quality Materials, Always

badge1
Icon
AI Powered Contstruction & Interior Experts.

Connect with Us
for Trusted, High-Quality
Construction with
Technology

Partner with us for seamless,
innovative construction solutions.

Weekly Payment
Based on Work
Clear Pricing
No Sq.Ft Cost
Save 15%+ with
Smart Solutions
Real-Time
Project Tracking
15-Yrs Structural
Warranty

Get Quotes from Any
Builder or Interiors Designer
Talk to Us before proceeding!!

Consult Us for Expert Guidance

Before moving forward, talk to us to explore how our advanced technology and transparent pricing can offer better solutions for your project.
Save up to 25%  in total.

 

  • Compare Quotes with Confidence
  • Expert Consultation Before You Proceed

Transparent Pricing.
Advanced Efficiency.

AI-Powered Solutions

Why Choose
Us?

Innovative, transparent, cost-effective solutions for seamless construction and interiors.

20+ Advantages
AI-Driven Construction Solutions

Advanced AI technology ensures precision in design and project management.

No Advance Payments

"You only pay as your project progresses—no upfront financial burden.

No Sqft Cost

Fair and transparent pricing based on actual costs, not square footage.

500+ Quality Checks

Every project undergoes rigorous quality checks at every construction stage.

Full Transparency Through Technology

Track project details, costs, and progress via our app and portal.

Zero Delays with AI Project Management

AI-driven tools ensure timely delivery with predictive scheduling and updates.

AI-Powered Solutions
Save 15%+ on Construction Costs

Can save 20% or more compared to traditional construction costs.

One-Stop Construction Solution

From design to completion, we handle every aspect of your project.

15-Year Structural Warranty

Our long-term warranty ensures your home’s durability and your peace of mind.

1-Year Free Maintenance

Enjoy one year of free maintenance services after project completion.

AI-Designed Floor Plans & 3D Visualizations

Visualize your future home with AI-powered designs and realistic 3D models.

CCTV Monitoring for Transparency

Monitor your project remotely with CCTV for full transparency and control.

* Clearer understanding

Home Construction Packages.

We don’t charge on a sq.ft basis. Instead, we maintain full transparency by pricing materials and labor, with an additional 7% commission. For comparison, traditional builders may quote Rs.1900, Rs.2600, Rs.2800, or Rs.3000 per sq. ft., but with Buildiyo, you can save 20% to 25% depending on the project size. While traditional builders offer Rs. 2370/sq.ft., you can get the same packages with Buildiyo for Rs. 1889/sq.ft., ensuring significant savings and value for your investment.

* All Projects, All-Inclusive, No Extra cost

Design & Drawings.

Design Elements

  1. Architectural Layout | 2D
  2. Basic Elevation
  3. 3D Elevation
  4. Interior Design Plans
  5. Landscaping Design

Structural Elements

  1. Structural Design
  2. Electrical Drawings
  3. Plumbing Drawings
  4. Roof Structure Design
  5. Fire Safety Plan
A Guide for Understanding Builder Fees

Traditional Builders Package

PREMIUM +

Calculated for Per Sqft

Rs.2370 /sq.ft
Design & Drawings
  1. 2D Floor Plan Drawings
  2. 3D Elevation Renderings
  3. Design Development – Up to 3 Revisions per Drawing
  4. Internal Isometric Views – Covering All Rooms and Open Spaces
  5. Visual Site Survey & Drawings Based on Client-Provided Measurements
Construction
  1. Floor to floor height: 10'6"
  2. Steel (500 TMT bars): Bhuwalka/Kamadhenu brands
  3. Cement (Grade 53): ACC/Penna/Dalmia brands
  4. UG Sump: Built with solid blocks of 8” thickness, waterproof plastered, 8000 liters capacity
  5. Concrete: M25 grade RMC (Ready-Mix Concrete)
  6. Red Bricks Wall:
    • Outer Walls: 9” thickness
    • Inner Walls: 4.5” thickness
  7. Plastering: Internal, external, and toilet wall – column joints plastered with chicken mesh using double washed M sand
  8. Waterproofing compound: Dr. Fixit/FOSROC for external walls
  9. Waterproofing: Cement-based waterproofing, including waterproofing in the terrace
  10. Steel/concrete lofts: Not included
  11. Ledge wall: Included for incorporating concealed sanitary parts
Flooring and Tiling
  1. Kitchen, Dining & Bedrooms:
    1. Vitrified Tiles – Rs.75/- per Sqft (Maximum tile size: 2’ X 2’)
  2. Living Room, Foyer:
    1. Marble finished vitrified tiles – Rs.85/- per Sqft (Tile size: 4' X 2')
  3. Staircase:
    1. Granite – Rs.115/- per Sqft
  4. Balcony, Sit-out, Passage & Common areas:
    1. Anti-skid tiles – Rs.60/- per Sqft
  5. Toilet Floor:
    1. Anti-skid tiles – Rs.60/- per Sqft
  6. Toilet Wall Dado (Up to 7ft height):
    1. Light & Highlighting tiles – Rs.55/- per Sqft
  7. Parking Area:
    1. Parking tiles – Rs.55/- per Sqft
  8. Kitchen Countertop:
    1. Granite – Rs.140/- per Sqft
  9. Kitchen Wall Dado (Up to 2’ above counter):
    1. Backsplash tiles – Rs.65/- per Sqft
  10. Puja Room - Wall Tiling: Not Included
  11. Puja Room - Granite Slab: Rs.115/- per Sqft
  12. Setback Area Tiles: Rs.55/- per Sqft (provided if setback area is charged)
Painting
  1. Internal Wall & Ceiling:

    1. 2 coats of wall putty
    2. 1 coat of primer
    3. 2-3 coats of Tractor Shine emulsion paint
  2. External Walls:

    1. Primer coat
    2. Apex weatherproof paint
  3. Brand Options:

    1. Asian
    2. Berger
    3. Dulux
Electrical
  1. Electrical Points:

    1. Light & power points provided as per design and client requirements
  2. Geyser Points:

    1. Provided in all bathrooms
  3. AC Provision:

    1. Available in all rooms
  4. Conduits:

    1. Good quality, hidden in slabs and walls
  5. Wiring:

    1. Fireproof copper wire (Finolex or equivalent)
  6. External Electrification:

    1. Included
  7. Switches & Plates:

    1. Anchor-Roma make
  8. Main DB & MCB:

    1. IndoAsian/Siemens/Equivalent make
  9. Electric Car Charging Point:

    1. Provided in the parking area
Plumbing
  1. Water Supply System: Comprehensive internal and external water supply system
  2. Water Inlet Connection: Connection from corporation water supply
  3. External Sewage System: Includes inspection chambers and sewage outlet to site boundary
  4. Piping: Class B CPVC pipes (Ashirwad/Astral make)
  5. Solar & Geyser Provision: Infrastructure for solar heating and geysers
  6. Rainwater Harvesting: Facility for ground water recharge
  7. Overhead Water Tank: PVC tank (Ganga or equivalent) with a basic price of Rs 7.25 per litre
  8. Plumbing: GI chamber covers provided for inspection chambers (IC)
  9. Sewage & Drainage Lines: Separate lines for sewage and drainage systems
Fixtures
  1. Kitchen Sink: SS/Granite/Carysil – Budgeted at Rs. 9,000/- per kitchen
  2. CP & Sanitary Fixtures:
    1. Includes Wash Basin, WC, Taps, and accessories like bottle traps and gratings
    2. Jaquar/Hindware brands – Rs. 27,000/- per bathroom attached toilet
    3. Rs. 10,000/- per powder room (if applicable)
  3. Electrical Fixtures: Not included in the package
Doors
  1. Main and Puja Door:

    1. Teak wood frame and shutter with hardware – Rs. 30,000/- per door
    2. Polished with melamine spray finish
  2. Internal Doors:

    1. Sal wood frame and flush shutter with hardware – Rs. 11,000/- per door
    2. Painted finish on door frames and shutters
  3. Bathroom Door:

    1. Frame and shutter with hardware – Rs. 8,000/- per door
  4. Door Hardware: High-quality fittings (Ozone/Europa/Dorma make)

  5. Door Hinges: Stainless Steel (SS) hinges for durability

  6. Cost Inclusions: Door and door frame costs include planning, rebate, transportation, and all associated expenses.

Windows
  1. UPVC Windows:

    1. 5mm clear glass with MS (Mild Steel) grills for added security
  2. Pricing:

    1. Basic price: Rs. 540 per Sqft for uPVC windows with MS grills
    2. Upgrade Option: Wooden windows available at an additional cost per Sqft, based on the chosen wooden material. The upgrade cost will be calculated according to the built-up area and the specific wood selected by the client.
Fabrication
  1. Main Gate:

    1. Designer gate – Priced at Rs. 400/- per Sqft
  2. External Staircase & Balcony Railing:

    1. Mild Steel (MS) railing – Priced at Rs. 600/- per Rft
  3. Internal Staircase Railing:

    1. Stainless Steel (SS) railing – Priced at Rs. 900/- per Rft
  4. Utility Grill:

    1. Not included in the package
Compound Wall
  1. Wall Structure:

    1. Solid block walls with a thickness of 4” to match the elevation (additional charges may apply)
  2. Construction Services Included:

    1. Excavation
    2. Foundation
    3. Plain Cement Concrete (PCC)
    4. Size stone masonry with Damp Proof Course (DPC) above SSM
  3. Wall Height:

    1. 5 feet from plinth levels
  4. Finishing:

    1. Plastered and painted compound walls
AI-powered transparency , savings.

How Buildiyo Saves You More

PREMIUM +

Calculated for 3000 sqft

Rs.2014 /sq.ft
Project Assumptions
  1. Project Assumptions

    1. Plot Size: 25 ft x 60 ft
    2. Ground Floor Height: 10.6 ft
    3. First Floor Height: 10.6 ft
    4. Headroom Height: 3 ft
    5. Building Base Height: 3 ft
    6. Parapet Wall Height: 4 ft

    Area Breakdown:

    1. Ground Floor Area (excluding parking): 1,000 sq. ft

      • Rooms on Ground Floor:
        • 1 bedroom
        • 1 bathroom
        • Kitchen
        • Living room
        • Dining room
    2. Parking Area: 500 sq. ft

      • Car parking space.
    3. First Floor Area: 1,500 sq. ft

      • Rooms on First Floor:
        • 2 bedrooms
        • 2 bathrooms (1 attached to the master bedroom)
        • Balcony
        • Small living space or family room
    4. Headroom: 500 sq. ft

      • Additional space for a terrace or extra storage area.
Foundation & Structure
  1. Cement:2,000 bags × ₹330 per bag=₹660,000
  2. Sand:118.05 units × ₹1,000 per unit=₹118,050
  3. Aggregates:27 units × ₹1,000 per unit=₹67,270
  4. Steel:9,068.6 kg × ₹60 per kg=₹544,116
  5. Bricks:61,372 bricks × ₹9 per brick=₹552348
  6. Total : ₹1,941734
Flooring and Tiling
  1. Kitchen, Dining & Bedrooms
    • 777.4 sq. ft × ₹75 = ₹58,305
  2. Living Room & Foyer
    • 299 sq. ft × ₹85 = ₹25,415
  3. Staircase
    • 5 sq. ft × ₹115 = ₹6,612.5
  4. Balcony, Sit-out, Passage, Common Areas
    • 5 sq. ft × ₹60 = ₹10,350
  5. Toilet Floor
    • 6 sq. ft × ₹60 = ₹9,936
  6. Toilet Wall Dado (Up to 7 ft height)
    • 6 sq. ft × ₹55 = ₹31,878
  7. Parking Area
    • 575 sq. ft × ₹55 = ₹31,625
  8. Kitchen Countertop
    • 23 sq. ft × ₹140 = ₹3,220
  9. Kitchen Wall Dado (Up to 2 ft above counter)
    • 23 sq. ft × ₹65 = ₹1,495
  10. Puja Room Granite Slab
    • 5 sq. ft × ₹115 = ₹1,322.5
  11. Setback Area
    • 230 sq. ft × ₹55 = ₹12,650
  12. Total : ₹192,808
Painting
  1. Total Internal Wall Area:
    1. 3874 sq. ft×₹28=₹108,472
  2. Total External Wall Area:
    1. 4794 sq. ft×₹25=₹119,850
  3. Total Ceiling Area:
    1. 3000 sq. ft×₹18=₹54,000
  4. Total : ₹282,322
Electrical
  1. 5mm² Wire = 1,008 meters × ₹25 = ₹25,200
  2. 5mm² Wire = 840 meters × ₹40 = ₹33,600
  3. 4mm² Wire = 280 meters × ₹60 = ₹16,800
  4. 6mm² Wire = 140 meters × ₹90 = ₹12,600
  5. Lighting Points (Switches) = 17 points × ₹150 = ₹2,550
  6. Fan Points (Switches) = 6 points × ₹250 = ₹1,500
  7. Power Sockets = 17 sockets × ₹200 = ₹3,400
  8. Main DB = 1 unit × ₹5,000 = ₹5,000
  9. Sub DB = 1 unit × ₹4,000 = ₹4,000
  10. MCBs (Miniature Circuit Breakers) = 6 MCBs × ₹800 = ₹4,800
  11. Main Circuit Breaker Panel = 1 unit × ₹7,000 = ₹7,000
  12. Ceiling Fans = 6 units × ₹2,200 = ₹13,200
  13. Light Fixtures = 11 units × ₹1,000 = ₹11,000
  14. AC Units = 2 units × ₹35,000 = ₹70,000
  15. Geysers = 2 units × ₹8,000 = ₹16,000
  16. Exhaust Fans = 2 units × ₹1,500 = ₹3,000
  17. Switchboards = 22 units × ₹500 = ₹11,000
  18. Total : ₹287,650
Plumbing
  1. 20mm Water Supply Pipes = 120 meters × ₹40 = ₹4,800
  2. 25mm Water Supply Pipes = 80 meters × ₹60 = ₹4,800
  3. 32mm Water Supply Pipes = 60 meters × ₹80 = ₹4,800
  4. 40mm Water Supply Pipes = 40 meters × ₹100 = ₹4,000
  5. 50mm Drainage Pipes = 80 meters × ₹50 = ₹4,000
  6. 75mm Drainage Pipes = 100 meters × ₹80 = ₹8,000
  7. 110mm Drainage Pipes = 40 meters × ₹120 = ₹4,800
  8. Kitchen Faucet = 1 unit × ₹1,500 = ₹1,500
  9. Bathroom Basin Faucets = 3 units × ₹1,200 = ₹3,600
  10. Shower Faucets = 3 units × ₹1,500 = ₹4,500
  11. Utility Faucet = 1 unit × ₹1,000 = ₹1,000
  12. Outdoor/Garden Faucet = 1 unit × ₹1,200 = ₹1,200
  13. Western-style Water Closets = 3 units × ₹6,500 = ₹19,500
  14. Flush Tanks = 3 units × ₹1,200 = ₹3,600
  15. Bathroom Washbasins = 3 units × ₹2,500 = ₹7,500
  16. Kitchen Sink = 1 unit × ₹3,000 = ₹3,000
  17. Shower Heads = 3 units × ₹1,500 = ₹4,500
  18. Hand Showers (optional) = 3 units × ₹1,200 = ₹3,600
  19. Geysers = 2 units × ₹8,000 = ₹16,000
  20. Overhead Water Tank (2,000 liters) = 1 unit × ₹6,000 = ₹6,000
  21. Ball Valves = 5 units × ₹300 = ₹1,500
  22. Angle Valves = 5 units × ₹250 = ₹1,250
  23. P-Traps/S-Traps = 4 units × ₹300 = ₹1,200
  24. Floor Traps = 3 units × ₹500 = ₹1,500
  25. Garden Hose Pipe = 1 unit × ₹1,000 = ₹1,000
  26. Floor Drains = 3 units × ₹400 = ₹1,200
  27. Total : ₹117,650
Fixtures
  1. Kitchen Faucet = 1 unit × ₹1,500 = ₹1,500
  2. Bathroom Basin Faucets = 3 units × ₹1,200 = ₹3,600
  3. Shower Faucets = 3 units × ₹1,500 = ₹4,500
  4. Utility Faucet = 1 unit × ₹1,000 = ₹1,000
  5. Outdoor/Garden Faucet = 1 unit × ₹1,200 = ₹1,200
  6. Western-style Water Closets = 3 units × ₹6,500 = ₹19,500
  7. Flush Tanks = 3 units × ₹1,200 = ₹3,600
  8. Bathroom Washbasins = 3 units × ₹2,500 = ₹7,500
  9. Kitchen Sink = 1 unit × ₹3,000 = ₹3,000
  10. Shower Heads = 3 units × ₹1,500 = ₹4,500
  11. Hand Showers (optional) = 3 units × ₹1,200 = ₹3,600
  12. Overhead Water Tank (2,000 liters) = 1 unit × ₹6,000 = ₹6,000
  13. Ball Valves = 5 units × ₹300 = ₹1,500
  14. Angle Valves = 5 units × ₹250 = ₹1,250
  15. P-Traps/S-Traps = 4 units × ₹300 = ₹1,200
  16. Floor Traps = 3 units × ₹500 = ₹1,500
  17. Garden Hose Pipe = 1 unit × ₹1,000 = ₹1,000
  18. Floor Drains = 3 units × ₹400 = ₹1,200
  19. Total : 66,150
Doors
  1. Main Entrance Door (Teak Wood) = 1 unit × ₹30,000 = ₹30,000
  2. Puja Room Door (Teak Wood) = 1 unit × ₹10,000 = ₹10,000
  3. Bedroom Doors (Sal Wood) = 3 units × ₹11,000 = ₹33,000
  4. Kitchen Door (Sal Wood) = 1 unit × ₹11,000 = ₹11,000
  5. Bathroom Doors = 4 units × ₹8,000 = ₹32,000
  6. Utility/Balcony Door (Sal Wood) = 1 unit × ₹11,000 = ₹11,000
  7. Storage Room/Closet Doors (optional) = 1 unit × ₹11,000 = ₹11,000
  8. Total : ₹138,000
Windows
  1. Living Room Windows (UPVC) = 3 units × 40 sq. ft × ₹450 = ₹54,000
  2. Bedroom Windows (UPVC) = 3 units × 12 sq. ft × ₹450 = ₹16,200
  3. Kitchen Window (UPVC) = 1 unit × 12 sq. ft × ₹450 = ₹5,400
  4. Bathroom Windows (UPVC) = 6 units × 8 sq. ft × ₹450 = ₹21,600
  5. Balcony/Utility Windows (UPVC) = 1 unit × 10 sq. ft × ₹450 = ₹4,500
  6. Total :₹101,700
Fabrication

Windows with MS Grill (Except Bathroom):

  1. Living Room Windows (MS Grill) = 3 units × 40 sq. ft × ₹110 = ₹13,200
  2. Bedroom Windows (MS Grill) = 3 units × 12 sq. ft × ₹110 = ₹3,960
  3. Kitchen Window (MS Grill) = 1 unit × 12 sq. ft × ₹110 = ₹1,320
  4. Balcony/Utility Windows (MS Grill) = 1 unit × 10 sq. ft × ₹110 = ₹1,100

Fabrication (Gates and Railings):

  1. Main Gate (Designer Gate) = 60 sq. ft × ₹350 = ₹21,000
  2. External Staircase Railing (MS) = 15 Rft × ₹600 = ₹9,000
  3. Balcony Railing (MS) = 25 Rft × ₹600 = ₹15,000
  4. Internal Staircase Railing (SS) = 15 Rft × ₹900 = ₹13,500
  5. Total : ₹83,360
Labor and Total Budget
  1. Civil + Centering Labor Cost = 3,000 sq. ft × ₹450 = ₹1,350,000
  2. Plumber Labor Cost = 3,000 sq. ft × ₹35 = ₹105,000
  3. Electrical Labor Cost = 3,000 sq. ft × ₹35 = ₹105,000
  4. Tiles Labor Cost = 3,000 sq. ft × ₹25 = ₹75,000

Total Budget Breakdown:

    1. Base Budget (Including Supervisor's Salary) = ₹49,48,374
    2. Contingency (7%) = ₹3,46,386
    3. Fees (7% on Base Budget + Contingency) = ₹3,70,633
    4. Total :₹56,65,393
    5. Per Sqft : 1,888

Per sq.ft Calculation.

Total Material Cost
Rs.32,11,374

Cement, Sand, Aggregates, Steel, Bricks, Flooring and Tiles, Painting, Electrical Installation, ,etcc

Lobor Cost
Rs.19,37,000

Civil + Centering , Plumber , Electrical , Tiles Labor Cost,Superwiser Salary

Contingency (7%)
Rs.34,63,86

A reserve allocated for unexpected project costs, material changes, or unforeseen on-site issues.

Service Charges (10%)
Rs.54,94,76

Includes app , project tracking, AI integration, labor allocation, and material sourcing, etc..

Final Budget
Rs.60,44,236

Totalbudget, including contingency and fees, covers unforeseen costs, labor, and material management.

Per Sq. Ft. Cost
Rs.2014

The final project budget of ₹56,65,393 divided by 3,000 sq. ft results in a per square foot cost of

Rs 0
Save Big on
Your Dream Home with Buildiyo
Other Pricing

Choose a plan that
fits your requirments.

Chennai
BASIC

Traditional Builders Package

Rs.2000


How Buildiyo Saves You More

Rs.1700 /Sq.ft
Contact Us for More Information or a Free Consultation Today
  • Steel (500 TMT bars) – Bhuwalka/Kamadhenu
  • Cement (Grade 43 or 53 as needed) – Penna/Dalmia
  • Concrete – M20 grade RMC
  • Solid Block walls – 6” & 4” thickness
Connect with Us Today
PREMIUM

Traditional Builders Package

Rs.2170


How Buildiyo Saves You More

Rs.1844 /Sq.ft
Contact Us for More Information or a Free Consultation Today
  • Steel (500 TMT bars) – Bhuwalka/Kamadhenu
  • Cement - Dalmia or Zuari or equivalent of 43 or 53 grade
  • Concrete – M20 or M25 grade RMC
  • Solid Block walls – 6” & 4” thickness
Connect with Us Today
LUXURY

Traditional Builders Package

Rs.2620


How Buildiyo Saves You More

Rs.2227 /Sq.ft
Get the current deal without any risk and additional fees.
  • Steel (500 TMT bars) – JSW/SAIL/Vizag
  • Cement (Grade 53) – ACC/ Ultratech/Ramco
  • Concrete – M25 grade
  • Red bricks Wall of – 9” ( outer Walls) & 4.5”(Inner Wall) thickness
Connect with Us Today

Challenges with Traditional Builders

Traditional builders often create financial risks, stress, and hidden costs, leading to dissatisfaction and poor quality.

Money at Risk, No Guarantees
  • Traditional Builders: Often require large deposits, tying up your funds before any work is completed.
  • Our Approach: No advance payments, ensuring your money is safe and only used as work progresses.
Low-Quality Materials for High Profit
  • Traditional Builders: Some may cut corners with cheap materials to increase their profits.
  • Our Approach: We use only high-quality materials, verified through our rigorous quality checks.
Limited Flexibility if Dissatisfied
  • Traditional Builders: Once you've paid upfront, you can't easily stop or change builders if you're unhappy with the work.
  • Our Approach: With no advance payments, you have control and flexibility throughout the project.
False Commitments and Hidden Charges
  • Traditional Builders: Often make promises they can’t keep and add hidden costs along the way.
  • Our Approach: We ensure full transparency with clear agreements and no hidden fees.
Lack of Proper Project Management
  • Traditional Builders: Poor project management can lead to delays and inefficiencies.
  • Our Approach: AI-driven project management ensures every aspect of the project is on track and efficient.
Costly Changes
  • Traditional Builders: Every change or modification during construction can come with a high price tag.
  • Our Approach: We allow flexibility and provide transparent cost adjustments for any changes.
Extra Charges for Essential Items
  • Traditional Builders: May add extra charges for necessary features like compound walls, sumps, or tanks.
  • Our Approach: We provide comprehensive quotes upfront, with no surprise costs for essential construction elements.
Increased Stress
  • Traditional Builders: The lack of transparency, hidden charges, and delays can cause significant stress.
  • Our Approach: We prioritize clear communication, transparency, and timely delivery to ensure a stress-free experience for you.
0
Challenges
with builders
0
Benefits
with buildiyo.com

How it Works

  • Raise a Request
  • Consult with Our Expert
  • AI-driven Design Creation
  • Get Client Approval
  • Detailed BOQ (Bill of Quantities)
  • Sign the Contract
  • Track Progress via Mobile App
  • Material Purchase Savings
  • In-depth Price Analysis
  • Complete Project with Satisfaction
Mobile App

You track
progress on app.

Monitor your construction project in real-time with our AI-powered app for seamless tracking and updates.
Popular
App & Portal Track

Track Your Home
Construction Effortlessly

Track your home construction progress in real-time with our app. Stay informed, manage tasks, and ensure transparency.
  • Track Real-Time Construction Progress and Updates
  • View Daily Site Photos and Videos
  • Monitor Detailed Project Timeline and Deadlines
  • Check Task Assignments and Current Status
  • Track Material Deliveries and Consumption Usage
  • Review Comprehensive Quality Checks and Reports
  • Watch Live CCTV Footage of Site
  • Log and Track Any Construction Issues
  • Submit and Track Construction Change Requests
  • Monitor Workforce Attendance and Productivity Levels
  • Message Directly with Your Site Manager

Our Projects

Build with Confidence:

Trusted House Construction Services

Reliable, Transparent, and Expert Construction Solutions for Your Dream Home

0
Benefits with
buildiyo.com
0
Percentage Save Big
Get help (Help Center)

Frequently
asked
questions.

How Does Buildiyo Calculate the Project Cost?
    • Buildiyo calculates project costs based on materials and labor, using AI to ensure optimized pricing, rather than a traditional per-square-foot model.
  •  

Is the Quoted Price Final?

The quoted price is nearly final, with only a small contingency added to cover unforeseen circumstances. AI helps ensure that the costs remain as accurate as possible.

What Expenses Are Covered in the Total Cost?

The total cost covers all material, labor, and design services, with AI optimizing the material usage and costs for better efficiency.

Are There Any Tax Implications?

Yes, any applicable taxes, such as GST, are included in the total project cost based on the materials and services provided.

Are There Hidden or Additional Charges?

No, Buildiyo’s pricing is transparent. AI-driven cost optimization ensures there are no hidden or unexpected fees, aside from a minor contingency discussed upfront.

What Happens if the Project Gets Delayed?

Buildiyo provides an estimated timeline for each project based on its size and scope. AI tools are used to predict and minimize potential delays.

Does Buildiyo Subcontract Any Work?

Yes, Buildiyo uses labor subcontracting for specific tasks, with no external contractors managing the entire project. AI ensures efficient management of all subcontracted work.

Can Buildiyo Help with Government Approvals?

Yes, Buildiyo offers assistance with all necessary government approvals and permits as part of the construction process.

How Does the Payment Process Work?

Payments are made weekly, based on the work completed that week. This approach ensures transparency and flexibility in managing costs.

How Long Does It Take to Complete a Project?

The time to complete a project depends on its size and complexity, with AI helping to streamline processes and optimize project timelines.

How Are Design Services Handled?

Buildiyo uses a combination of AI and expert designers to create custom designs, ensuring the perfect blend of technology and creativity for each project.

How Can I Monitor My Project's Progress?

Buildiyo offers a mobile app for real-time tracking of your project. You can monitor progress, approve designs, and receive updates directly through the app.

How Does Buildiyo Use AI in Construction?

AI is used for cost optimization, material selection, and efficient project management. It helps minimize waste, predict delays, and ensure quality at every stage of the project.

What items are not included?
  • Government fees for liaising with regulatory bodies must be paid directly by the client.
  • All fees related to plan sanction in Panchayat limits are the client’s responsibility.
  • If the ground level needs to be raised more than 18", extra costs apply.
  • Any excavation involving hard or soft rock incurs extra costs if encountered.
  • Costs for buying new earth or removing existing earth for excavation/backfilling are based on actuals.
  • Pile foundation, if required, comes at an extra cost.
  • Clients must provide one electricity and water point free of cost for the construction process.
  • Soil Bearing Capacity (SBC) is assumed to be 180 KN/M², with a foundation depth of 5 feet. Any changes to these conditions result in extra costs based on site conditions.
  • If there are material delivery or storage constraints requiring smaller quantities, extra costs apply.
  • A designated area within 50 feet of the construction site must be provided for labor and material sheds by the client.
  • Any road cutting for electricity or sewage line connections is not included and incurs extra costs.
How is the payment structure handled during the construction process?
  • No Advance Payment: Unlike traditional builders who require an advance payment of 10% or 20%, Buildiyo does not ask for any upfront payment.

  • Weekly Progress-Based Payment: Payments are made on a weekly basis, based on the actual progress of the project. This ensures that you only pay for the work completed during each week, providing transparency and flexibility.

  • Payment Calculation: Payments are calculated based on the cost of materials and labor for that specific week. The exact amounts will be shared in real-time, ensuring that you’re always aware of how much you’re paying and for what.

  • Transparent Material and Labor Costs: The cost of materials and labor is completely transparent. You’ll have access to all relevant information, ensuring there are no hidden charges or surprises.

  • Breakdown of Costs: Every payment is clearly broken down into materials, labor, and any other additional expenses, making it easy for you to track where your money is going.

This website stores cookies on your computer. Cookie Policy